History of the plant
1939-The organizing of the aircraft repairing base, 406 CA.
Adjustment of the fundamental repairing of the
Plane PO-2, aviation engine M-11.
1941-The adjustment of the fundumental repairing of the
plane P-5, PR-5, UT- 2.
1942-The adjustment of the fundumental repairing of the
aviation engines M-17, M-34.
1956-The adjustment of the fundumental repairing of the
plane YAK-12, helicopter MI-1, and aviation
engines AI-14R, М-11R.
1958-The adjustment of the repair of the MI-1 helicopter,
aviation engines AI-14R, AI-26B.
1959-The adjustment of the fundumental repairing of the
plane AN-2.
1960-The first rebuild lot of the aviation engines AI-26B.
1970-The adjustment of the fundumental repairing of the
aviation engine AI-14RF.
1974-The adjustment repair the helicopter MI-2.
1975-The adjustment of the fundumental repairing of the
aviation engine GTD-350 - the second type.
1976-The adjustment of the fundumental repairing of the
aviation engine GTD-350 - the third type.
1977-The adjustment of the fundumental repairing of the
aviation engine GTD-350 -the fourth type.
The main gear VR-2.
1980-The adjustment of the fundumental repairing of the
plane YAK-18T.
1982-The adjustment of the fundumental repairing MSX
of the main gear VR-2.
1986-The adjustment of the fundumental repairing of the
helicopter's transmission MI-2.
1995-The adjustment of the fundumental repairing of the
aviation engine М-14P.
1996-The adjustment of the engine ASH-62IR started.
2001-The adjustment of the fundumental repairing of the
aviation engine ASH-62IR.
2012-The adjustment of the helicopter's MI-8MT technical
operation started.